Visits
- 01.03.2020. RTS Šarenica https://youtu.be/HJC6zfVOMRM?t=3083
- 28.10.2019. RTS Jutarnji program http://www.rts.rs/page/stories/ci/story/124/drustvo/3713912/biogas-bi-mogao-da-nam-sacuva-vazduh-svako-selo-bi-moglo-da-pomogne.html
- 05.10.2019. RTS Šarenica https://youtu.be/fC8mcUBmOcg?t=3647
- 01.10.2019. PINK Svitanje https://youtu.be/NVl4wpWqZHM?t=768
Reference list
- July 2019 – Project for the construction of wastewater treatment in milk factory Milka MD Velika Vrbnica
- December 2018 – March 2019 Feasibility Study for Biogas Plant – Al Dahra – Padinska Skela
- October 2018 – ongoing – Analytical study on the possibilities and practical application of renewable energy sources in public utility companies
- September 2018 – Contract for business and technical cooperation with company Aqua – M 018 – Nis signed
- August 2018 – Signed Distributor Agreement for Abrimix Wastewater Treatment Technology – Abrimix – South Africa
- August 2018 – ongoing – Consultant and project management of biomass power plant construction of 637 kW – Divos
- October 2017 – June 2018 – Technical consulting for biomass plant 1 MW – Svetozar Miletić
- November 2017 – May 2018 – Feasibility study and consultancy activities – JKP Vodokanal, Sombor
- May 2017 – Signed Memorandum of Understanding between IBBK – International Biogas and Bioenergy Center and Green Mile Team
- May 2017 – Green Mile Team becomes consultant of CreditAgricole Bank for Biogas
- March 2017 – June 2017 – Feasibility studies for four small biogas plants – RRA Srem
- March 2017 – April 2017 – Evaluation of the current situation and consulting activities – Slovan Selenča
- December 2016 – March 2018 – Consultants for a 1 MW biogas plant project – Veliko Gradiste
- September 2016 – November 2016 – Feasibility study for biogas plant in Chester – GIZ partner
- October 2017 – Lecturers on biogas training in the Serbian Chamber of Commerce – GIZ partner
- February 2016 – September 2017 -Evaluation of the existing situation and feasibility studies for biogas power plant on chicken manure – Kulpin
- January 2016 – December 2017 – Evaluation of the existing situation, feasibility studies, licensing of pyrolysis project on wood cutting – Lapovo
- March 2016 – December 2016 – Technical consulting for the project of the factory for production of eco crates from pulp – Backa Palanka
- May 2015 – ongoing – Technical consulting and project management for 190 kW biomass power plant – Žabalj
- a biogas plant of 635 kW put into operation – Project management – Global Seed – Čurug
Ime: Vladimir Vodalov
Funkcija: Generalni direktor
Mobilni: + 381 62 684 941
E-mail: vladimir.vodalov@greenmileteam.com
Obrazovanje: Univerzitet u Novom Sadu, Fakultet Tehničkih nauka – Master mašinstva
Profesionalno iskustvo:
Lafarge BFC d.o.o. Beočin – Upravnik proizvodnje – do 2015. god.
Sintelon RUGS d.o.o. Bačka Palanka – Rukovodolac održavanja I investicija – pogon, Predionice – do 2008. god.
Majevica d.o.o. Bačka Palanka – Inženjer mašinstva – 2003. god.
U toku karijere učešće u mnogobrojnim projektima u okviru pomenutih međunarodnih kompanija.
Ime: Goran Knežević
Funkcija: Tehnički direktor
Mobilni: + 381 69 14 08 148
E-mail: goran.knezevic@greenmileteam.com
Obrazovanje: Univerzitet u Novom Sadu, Fakultet Tehničkih nauka – Master Elektrotehnike i računarstva
Profesionalno iskustvo:
Global Seed d.o.o. Čurug – Direktor Elektrane na biogas – do sredine 2014. god.
Velvet Farm d.o.o. Čurug – Rukovodolac projekta izgradnje Elektrane na biogas – do 2013. god.
Intact d.o.o. Bačka Palanka – Suvlasnik male IT firme – do 2010. god.
RB d.o.o. Bački Petrovac – Rukovodilac projekata automatizacija crpne stanice, kompresorske stanice i trafostanice u firmi Sintelon d.o.o. iz Bačke Palanke – do sredine 2005. god.
Vojvodinašped A.D. Novi sad – Samostalni stručni saradnik u sektoru informatike – do sredine 2004. god.